The foundation is done and it is time to start laying the logs. The first step is to screw bolts into the foundation. |
Insulation and a specially treated wood come next. |
Jen and Ken hard at work. |
This corner piece ensures the walls stay straight as the logs are laid. |
Cooling off the drill and ready for the next step. |
Bringing over the logs. Atticus and Deja are supervising. |
A groove for wiring had to be cut in some of the logs at this point. The first electrical inspection has already passed. |
No comments:
Post a Comment